• Documentation
  • Jurisdictions
  • Data Sources
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberHC-BLD-25-0075959
JurisdictionHillsborough County
Categorybuilding
Last CheckedMar 26, 2026
Status
Withdrawn
Description

PI# 7124 New construction of a 5-story Type 3A apartment building with 113 dwelling units to be developed under the Live Local Housing Act.

Owner
Mainstreet Westlake Ltd
Address
8751 CORPORATE LAKE DR APT 101, TAMPA, FL 33634
Zoning
Manufacturing
Risk
AE
Advanced details
Owner
Mainstreet Westlake Ltd
Parcel
0238770712
Value
$2,397,103.00
Acreage:
7.95
Land Use Code:
4000
Land Use Group:
VACANT INDUS.
Zoning Category:
Commercial/Office/Industr
Zoning Acres:
193767.4473
FIRM Panel:
1201120195D
Flood Source:
12057C_STUDY5
Planning Area:
Town and Country
Area (sq mi):
15.26
Census Tract:
011611
Legal Description

Westlake Corporate Park, Tract F

Preparing the map…

8751 CORPORATE LAKE DR APT 101, TAMPA, FL 33634

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied - Building Permit - Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2025-08-19
Default - 8 Applied - Building Permit - Address Verification
Address Validation
Informational • 2025-08-19
NOC Required
Notice of Commencement Required
Informational • 2025-08-19
Threshold Building Owner Acknowledgement
Threshold Building Owner Acknowledgement
Informational • 2025-08-19
Impact Fees Due
Impact fees must be paid in full prior to the issuance of the Certificate of Occupancy
Informational • 2025-08-19

Related Records

Track this permit to view related recordsStart Free Trial

Frequently Asked Questions

Related Links

Jurisdiction

  • View all Hillsborough County permits
  • View on Hillsborough County

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied - Building Permit - Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2025-08-19
Default - 8 Applied - Building Permit - Address Verification
Address Validation
Informational • 2025-08-19
NOC Required
Notice of Commencement Required
Informational • 2025-08-19
Threshold Building Owner Acknowledgement
Threshold Building Owner Acknowledgement
Informational • 2025-08-19
Impact Fees Due
Impact fees must be paid in full prior to the issuance of the Certificate of Occupancy
Informational • 2025-08-19

Related Records

Track this permit to view related recordsStart Free Trial
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Mar 10, 20261 change
  • Status updated from Awaiting Client Reply to Withdrawn
Get notified when this permit changes.
Add to Plotwise Watchlist →