Revision narrative and detail to use threaded rod to tie the first and second floor together in lieu of the exterior strapping. Also changing the tie down hardware on studs at each side of load bearing headers. SP1s and SP2s remain as per plan.
Preparing the map…
201 N 26TH ST FS, TAMPA, FL 33605