1. Change in the location of the proposed new door to avoid the conflict with the meters on the exterior face of the wall. Accordingly, Revised Life Safety Plan LS-1.1 to show the revised path of the corridor to exit from the existing door. 2. Revised Proposed floor Plan and Reflected Ceiling plans showing the revised location of the new proposed door and the open ceiling (removal of ACT) in the seating area in front of the counter. 3. Revised electrical Power Layout Plan E1.1 to show the three additional receptacle/boxes at the counter. 4. Revised electrical Lighting Layout E1.2 showing the removal of ACT ceiling in seating area and the revised light fixtures compatible with the open ceiling. 5. Revised Gas Plan GN1.1 to show the removal of the Tankless Water Heater above the Mop Sink. This has been installed on the Rear Right Corner by TECO and the revised Gas line connection to the WH. 6. Revised duct layout on the Mechanical Plan M1.1 7. Revised Plumbing Plan P1.2 showing connection to the relocated Water Heater.