Required revision to redirect drainage outside of the off site tree protection zone.
Required revision to redirect drainage outside of the off site tree protection zone
Informational • 2022-10-05
Building - 2 Applied - Building Permit - Stormwater Department approval required prior to C.O.
Per Stormwater Engineer Alex Awad, the new off-site drainage pipe at the rear of the property will require stormwater confirmation/inspection. Additionally, the GC will need to cleanout the entire off-site drainage pipe
Informational • 2023-12-07