Building Plans - SECURE PLANS
Government Owned/Operated
Informational • 2016-04-17
Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-22-0000094 for the pre-engineered metal building and solar panels. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-08-29
Grand Tree removal without a permit - tree damaged during demolition and is effectively removed.
Grand Tree removal without a permit - tree damaged during demolition and is effectively removed. Triple permit fee, mitigation per the tree table and 1-3" penalty tree required
Informational • 2023-09-19
Building - 2 Released, 2 Applied - Building Permit - No tree removal until building permits issued.
No tree removal until building permits issued
Informational • 2024-07-17