• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-22-0495085-REV1
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Complete
Description

Central Fleet Building Plan revisions to capture RFI's and ASI's issued since permit was issued.

Owner
City Of Tampa
Address
2515 E HANNA AVE, TAMPA, FL 33610
Zoning
TRANSITIONAL USE-24 (1.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
City Of Tampa
Parcel
1510140000
Value
$54,306,148.00
Year Built
2023
Stories:
10
Units:
0
Buildings:
4
Land Use Code:
8900
Zoning Acres:
147427.2752
FIRM Panel:
1201140007C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
001001
Population:
162

Preparing the map…

2515 E HANNA AVE, TAMPA, FL 33610

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Government Owned/Operated
Informational • 2016-04-17
Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-22-0000094 for the pre-engineered metal building and solar panels. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-08-29
Grand Tree removal without a permit - tree damaged during demolition and is effectively removed.
Grand Tree removal without a permit - tree damaged during demolition and is effectively removed. Triple permit fee, mitigation per the tree table and 1-3" penalty tree required
Informational • 2023-09-19
Building - 2 Released, 2 Applied - Building Permit - No tree removal until building permits issued.
No tree removal until building permits issued
Informational • 2024-07-17

Related Records8

BLD-22-0495085-REV1
Complete
BLDLP-23-006746
Complete
BLDLP-23-006740
Complete
BLD-23-0503180
Complete
BLDLP-23-008696
Complete
BLDLP-23-006741
Complete
BLDCO-23-000844
Complete
BLDCO-23-000848
Complete
BLDLP-23-006742
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-23-006746 (related)
  • BLDLP-23-006740 (related)
  • BLD-23-0503180 (related)
  • BLDLP-23-008696 (related)
  • BLDLP-23-006741 (related)
  • BLDCO-23-000844 (related)
  • BLDCO-23-000848 (related)
  • BLDLP-23-006742 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Government Owned/Operated
Informational • 2016-04-17
Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-22-0000094 for the pre-engineered metal building and solar panels. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by revision record by the building official or designee. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2022-08-29
Grand Tree removal without a permit - tree damaged during demolition and is effectively removed.
Grand Tree removal without a permit - tree damaged during demolition and is effectively removed. Triple permit fee, mitigation per the tree table and 1-3" penalty tree required
Informational • 2023-09-19
Building - 2 Released, 2 Applied - Building Permit - No tree removal until building permits issued.
No tree removal until building permits issued
Informational • 2024-07-17

Related Records8

BLD-22-0495085-REV1
Complete
BLDLP-23-006746
Complete
BLDLP-23-006740
Complete
BLD-23-0503180
Complete
BLDLP-23-008696
Complete
BLDLP-23-006741
Complete
BLDCO-23-000844
Complete
BLDCO-23-000848
Complete
BLDLP-23-006742
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →