Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-06-10
Building - 2 Applied, 5 Complied - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2024-01-04
Stop Work Order
All construction work is required to cease until terms and conditions of order is satisfied. Section 21-9- Protection of Public drainage systems. 4th disapproved site erosion inspection. Corrections not made
Informational • 2024-08-28
Tree restoration plan
Prior to C/O A tree restoration plan by an ISA certified arborist is required due to substantial root damage (roots >2" were cut) on the 46” grand laurel oak. Tree was damage due to the digging of footer in the incorrect location. To satisfy the required condition placed on the record and GEN-Investigation inspection, the comprehensive restoration plan (must include plan to repair damaged soils and promote an efficient soil environment which optimizes fine root performance and plan to check tree during and after construction) The ISA certified tree restoration plan ought to be submitted into the record for natural resource review or email to henry.salazarperez@tampagov.net
Informational • 2024-12-04
Termite certification
Termite certification required prior to C/O
Informational • 2024-12-10