• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0501610
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 8, 2025
Status
Pending
Description

interior non-structural demolition, new interior walls, finishes, ceilings, plumbing, HVAC, electrical, new exterior walk-in cooler and partial storefront system replacement. Trades: Bldg, MEP, No Fire

Job Value

$250,000.00

Owner
D N J Inc And Richard A Parrino Llc
Address
1904 W KENNEDY BLVD, TAMPA, FL 33606
Zoning
URBAN MIXED USE-60 (3.25 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
D N J Inc And Richard A Parrino Llc
Parcel
1842490000
Value
$483,152.00
Year Built
1946
Stories:
2
Units:
0
Buildings:
1
Land Use Code:
2103
Zoning Acres:
147427.2752
FIRM Panel:
1201140023C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004900
Population:
15

Preparing the map…

1904 W KENNEDY BLVD, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-06-20
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2023-06-20
Building - 1 Not Applicable, 2 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-15

Related Records8

BLD-23-0501610
Pending
BLDLP-24-008217
Complete
BLDLP-25-004980
Complete
BLDCO-25-000414
Complete
BLD-23-0501610-REV2
Withdrawn
UTL-24-0001639
In Process
BLDCO-24-001151
Complete
BLD-23-0501610-REV1
Complete
BLDLP-25-001682
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-008217 (related)
  • BLDLP-25-004980 (related)
  • BLDCO-25-000414 (related)
  • BLD-23-0501610-REV2 (related)
  • UTL-24-0001639 (related)
  • BLDCO-24-001151 (related)
  • BLD-23-0501610-REV1 (related)
  • BLDLP-25-001682 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-06-20
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2023-06-20
Building - 1 Not Applicable, 2 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-15

Related Records8

BLD-23-0501610
Pending
BLDLP-24-008217
Complete
BLDLP-25-004980
Complete
BLDCO-25-000414
Complete
BLD-23-0501610-REV2
Withdrawn
UTL-24-0001639
In Process
BLDCO-24-001151
Complete
BLD-23-0501610-REV1
Complete
BLDLP-25-001682
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →