• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0501761
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 8, 2025
Status
Pending
Description

Reissued and the original date: 09/13/2023: Project provides for improvements to the existing Filter Building, associated site improvements, and existing facility demolition at the City’s Morris Bridge site. Work includes retrofitting the roof of the Filter Building, removing sediment and vegetation at the three stormwater ponds, and demolishing tanks, building, concrete pavement, and piping.

Job Value

$4,363,025.00

Owner
City Of Tampa
Address
17101 DONA MICHELLE DR, TAMPA, FL 33647
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
City Of Tampa
Parcel
0339700100
Value
$13,350,475.00
Square Feet
46559
Year Built
1979
Stories:
9
Buildings:
7
Acreage:
56.56
Land Use Code:
8900
Land Use Group:
GOVERNMENT
Zoning Acres:
147440.3701
FIRM Panel:
1201120230E
Flood Source:
12057C_STUDY5
Census Tract:
010211
Population:
1145
Legal Description

That Part Of Sections 23 And 24 Desc As Beg, 2632.49 Ft S Of Ne Cor Of Sec 23 And Run E 679.56, Ft S 420.88 Ft S 10 Deg 37 Min 07 Sec E 1166.17 Ft, W 1616.49 Ft N 17 Deg 04 Min 19 Sec W 354.31 Ft

Preparing the map…

17101 DONA MICHELLE DR, TAMPA, FL 33647

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURED PLANS
Government Owned/Operated
Informational • 2016-02-11
Building - 6 Not Applicable, 1 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-13
Utility Application Submittal
A Utility application is not required for roof replacement
Informational • 2023-10-30
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2024-03-18
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-03-18

Related Records3

BLD-23-0501761
Pending
BLDLP-25-001118
Complete
BLDCO-25-001694
Complete
BLDLP-25-001275
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-25-001118 (related)
  • BLDCO-25-001694 (related)
  • BLDLP-25-001275 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURED PLANS
Government Owned/Operated
Informational • 2016-02-11
Building - 6 Not Applicable, 1 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-13
Utility Application Submittal
A Utility application is not required for roof replacement
Informational • 2023-10-30
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2024-03-18
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-03-18

Related Records3

BLD-23-0501761
Pending
BLDLP-25-001118
Complete
BLDCO-25-001694
Complete
BLDLP-25-001275
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →