• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0501945
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

Conversion of 12th floor, pod4 office space to induce partitioned dedicated data center space for data cabinet racks, and six (6) glycol cooled crac units, and two (2) new ups's within existing 12th floor level ups. Coordination of all associated ceilings and support systems for new dedicated data room. Misc. mechanical and electrical work on 8th and 10th floor

Job Value

$1,000,000.00

Owner
Twc Fifty Eight Ltd
Address
655 N FRANKLIN ST, TAMPA, FL 33602
Zoning
CENTRAL BUSINESS DISTRICT
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Twc Fifty Eight Ltd
Parcel
1934490000
Value
$34,694,200.00
Year Built
1965
Stories:
29
Units:
0
Buildings:
2
Land Use Code:
1830
Zoning Acres:
147427.2752
FIRM Panel:
1201140024C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
005101
Population:
0

Preparing the map…

655 N FRANKLIN ST, TAMPA, FL 33602

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 7 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-07-06
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-07-06
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-07-06
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-07-06
Selective Coordination
The selective coordination for the Critical operations data system(s) overcurrent protective devices shall be submitted as plans revision for approval prior to final inspection and shall be present at inspection for this system and breakers settings/specs. Selective coordination document shall be approved by the COT inspector prior to CO. NEC 645.27
Informational • 2023-09-12

Related Records10

BLD-23-0501945
Pending
BLDCO-23-000836
Complete
BTR-23-0572296
Withdrawn
BLDCO-23-000962
Complete
BTR-23-0575512
Expired
BLDEXT-23-0001407
Complete
BLD-23-0502131
Expired
BTR-23-0573957
Withdrawn
BLDCO-24-001111
Complete
BTR-23-0571867
Complete
BLD-24-0505155
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-23-000836 (related)
  • BTR-23-0572296 (related)
  • BLDCO-23-000962 (related)
  • BTR-23-0575512 (related)
  • BLDEXT-23-0001407 (related)
  • BLD-23-0502131 (related)
  • BTR-23-0573957 (related)
  • BLDCO-24-001111 (related)
  • BTR-23-0571867 (related)
  • BLD-24-0505155 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 7 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-07-06
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-07-06
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-07-06
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-07-06
Selective Coordination
The selective coordination for the Critical operations data system(s) overcurrent protective devices shall be submitted as plans revision for approval prior to final inspection and shall be present at inspection for this system and breakers settings/specs. Selective coordination document shall be approved by the COT inspector prior to CO. NEC 645.27
Informational • 2023-09-12

Related Records10

BLD-23-0501945
Pending
BLDCO-23-000836
Complete
BTR-23-0572296
Withdrawn
BLDCO-23-000962
Complete
BTR-23-0575512
Expired
BLDEXT-23-0001407
Complete
BLD-23-0502131
Expired
BTR-23-0573957
Withdrawn
BLDCO-24-001111
Complete
BTR-23-0571867
Complete
BLD-24-0505155
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →