• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0502045
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

A new five (5) unit, three-story, townhouse is proposed onsite. Relocation of existing structure permitted under BLD-24-0504786

Owner
Ybor Marti Llc
Address
1500 ANGEL OLIVA SENIOR ST, TAMPA, 33605SITE ADDRESS ID: 099082UTILITY SERVICE NUMBER: 0514961STRAP: 1929184WW000066000100AFOLIO: 190077.0100LEGACY SITE ID: 000000LEGACY FOLIO: 190077.0100ATLAS ID: H-13SEC/TWP/RGE: 182919MSS INDICATOR: YSTATUS: CURRENTDESCRIPTION: 009100 VIEW ADDITIONAL LOCATIONS>>1)1502 ANGEL OLIVA SENIOR ST, TAMPA, FL 33605
Risk
—
Advanced details
Owner
—
Parcel
—
Value
—

Preparing the map…

1500 ANGEL OLIVA SENIOR ST, TAMPA, 33605SITE ADDRESS ID: 099082UTILITY SERVICE NUMBER: 0514961STRAP: 1929184WW000066000100AFOLIO: 190077.0100LEGACY SITE ID: 000000LEGACY FOLIO: 190077.0100ATLAS ID: H-13SEC/TWP/RGE: 182919MSS INDICATOR: YSTATUS: CURRENTDESCRIPTION: 009100 VIEW ADDITIONAL LOCATIONS>>1)1502 ANGEL OLIVA SENIOR ST, TAMPA, FL 33605

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-07-12
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-07-12
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-07-12
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-07-12
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-07-12

Related Records10

BLD-23-0502045
Pending
BLD-24-0508895
Pending
BLD-23-0501745-REV1
Complete
BLDCO-23-000738
Complete
BLDLP-25-005319
Complete
BLDCO-23-000887
Complete
UTL-23-0001403
In Process
BLD-24-0508898
Pending
UTL-23-0001612
In Progress
BLD-24-0504786
Pending
BLD-23-0501745
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0508895 (related)
  • BLD-23-0501745-REV1 (related)
  • BLDCO-23-000738 (related)
  • BLDLP-25-005319 (related)
  • BLDCO-23-000887 (related)
  • UTL-23-0001403 (related)
  • BLD-24-0508898 (related)
  • UTL-23-0001612 (related)
  • BLD-24-0504786 (related)
  • BLD-23-0501745 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-07-12
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-07-12
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-07-12
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-07-12
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-07-12

Related Records10

BLD-23-0502045
Pending
BLD-24-0508895
Pending
BLD-23-0501745-REV1
Complete
BLDCO-23-000738
Complete
BLDLP-25-005319
Complete
BLDCO-23-000887
Complete
UTL-23-0001403
In Process
BLD-24-0508898
Pending
UTL-23-0001612
In Progress
BLD-24-0504786
Pending
BLD-23-0501745
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →