• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0503030
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

The project is a single 6 story building ( Building B) that is part of a first phase development in a planned site. This first phase building contains non-separated mixed use occupancy, with a mixed use one story podium containing an S-2 open parking garage co-located with A-3 and B uses with 5 stories of R-2 residential building over the one story podium. Master Site & Foundation is under permit # BLD-23-0500218. Utility application is under UTL-23-0000487.

Owner
Se Tampa Bay Llc
Address
5411 W TYSON AVE, TAMPA, FL 33611
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Se Tampa Bay Llc
Parcel
1311830010
Value
$21,143,819.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
4000
Zoning Acres:
147427.2752
FIRM Panel:
1201140036C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
150

Preparing the map…

5411 W TYSON AVE, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-08-22
Building - 7 Applied, 3 Released - Building Permit - Special Inspector
Threshold building with a Special Inspector assigned
Informational • 2023-10-24
Flood Certificate Required
Flood Certificate Required
Informational • 2023-10-24
Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-25-0000013 for steel stairs, ladders, guardrails, handrails, guard cables, cold-formed metal framing, wood floor and roof trusses, wood connection hardware, exterior glazing systems, pre-manufactured canopy systems, Wood shear wall anchor tiedown system, Wood wall uplift restraint system, pre-engineered metal dunnage for RTU support, selective coordination study for Emergency Power System, generator Anchoring, swimming pool and pool equipment and tie-down details for rooftop piping and all roof mounted equipment. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by a revision to the BLD record (BLD-23-0503030). The condition will be affirmatively noted on the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2025-02-19
Final Dry floodproofing certificate required
Final Dry floodproofing certificate required
Informational • 2025-07-01

Related Records4

BLD-23-0503030
Pending
BLDCO-24-001219
Complete
BLDCO-24-001216
Complete
CBO-25-0000013
Complete
BLD-23-0500218
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-24-001219 (related)
  • BLDCO-24-001216 (related)
  • CBO-25-0000013 (related)
  • BLD-23-0500218 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-08-22
Building - 7 Applied, 3 Released - Building Permit - Special Inspector
Threshold building with a Special Inspector assigned
Informational • 2023-10-24
Flood Certificate Required
Flood Certificate Required
Informational • 2023-10-24
Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-25-0000013 for steel stairs, ladders, guardrails, handrails, guard cables, cold-formed metal framing, wood floor and roof trusses, wood connection hardware, exterior glazing systems, pre-manufactured canopy systems, Wood shear wall anchor tiedown system, Wood wall uplift restraint system, pre-engineered metal dunnage for RTU support, selective coordination study for Emergency Power System, generator Anchoring, swimming pool and pool equipment and tie-down details for rooftop piping and all roof mounted equipment. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by a revision to the BLD record (BLD-23-0503030). The condition will be affirmatively noted on the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2025-02-19
Final Dry floodproofing certificate required
Final Dry floodproofing certificate required
Informational • 2025-07-01

Related Records4

BLD-23-0503030
Pending
BLDCO-24-001219
Complete
BLDCO-24-001216
Complete
CBO-25-0000013
Complete
BLD-23-0500218
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →