Upon demolition the demising wall between the two Suites was found to be a framed wall and not CMU as it was reflected in the first set of plans. A note was added on the framed wall all across the new set of plans. A new 2HR fire rated wall detail on plan E01(including UL spec found under other documents was included) was added for the new proposed framed wall. An Engineering report from a design professional on the structural wall with pictures was also included in the new revision as requested by BLD Inspector. Those are the only three changes on the revision, everything else remains as originally Approved.