Building - 1 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-13
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-12-06
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-12-07
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-12-07
Utilities - Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied.1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-05-29