• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0503738
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Complete
Description

Construct New 2-Story SF custom home. Includes garage, entry porch, screened lanai.

Job Value

$500,000.00

Owner
Piccolo And Shetal Ravel Swamy
Address
4418 W ESTRELLA ST, TAMPA, FL 33629
Zoning
RESIDENTIAL-6
Risk
AESFHABFE 9 ft
Advanced details
Owner
Piccolo And Shetal Ravel Swamy
Parcel
1204600000
Value
$382,500.00
Year Built
2025
Stories:
2
Units:
0
Buildings:
1
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140031C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
005900
Population:
42

Preparing the map…

4418 W ESTRELLA ST, TAMPA, FL 33629

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 4 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-22
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-09-22
Flood Certificate Required
Flood Certificate Required
Informational • 2025-01-13
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2025-01-13
Termite Cert
Termite Certification Required
Informational • 2025-03-12

Related Records6

BLD-23-0503738
Complete
BLD-24-0508841
Complete
UTL-23-0002080
In Progress
BLDLP-24-003374
Complete
BLDLP-24-005733
Complete
BLDLP-24-003281
Complete
BLDCO-24-001077
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0508841 (related)
  • UTL-23-0002080 (related)
  • BLDLP-24-003374 (related)
  • BLDLP-24-005733 (related)
  • BLDLP-24-003281 (related)
  • BLDCO-24-001077 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 4 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-22
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-09-22
Flood Certificate Required
Flood Certificate Required
Informational • 2025-01-13
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2025-01-13
Termite Cert
Termite Certification Required
Informational • 2025-03-12

Related Records6

BLD-23-0503738
Complete
BLD-24-0508841
Complete
UTL-23-0002080
In Progress
BLDLP-24-003374
Complete
BLDLP-24-005733
Complete
BLDLP-24-003281
Complete
BLDCO-24-001077
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →