• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-23-0503749
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

CMP-23-0004019 enclosure of the existing carport. Removing the existing driveway and installing sod. Permit canopy

Owner
Hector And Anet Proenza
Address
4405 N HESPERIDES ST, TAMPA, FL 33614
Zoning
LIGHT INDUSTRIAL (1.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Hector And Anet Proenza
Parcel
1081380000
Value
$157,483.00
Year Built
1958
Stories:
1
Units:
0
Buildings:
1
Land Use Code:
2703
Zoning Acres:
147427.2752
FIRM Panel:
1201140013C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
002600
Population:
0

Preparing the map…

4405 N HESPERIDES ST, TAMPA, FL 33614

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-03-17
Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-22
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-09-22
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-09-22
required mitigation
Install two 2.5" Caliper Type 1 Trees and one 3" penalty tree or pay into the applicable Tree Trust Fund for any trees not planted
Informational • 2025-05-13

Related Records1

BLD-23-0503749
Pending
BLDCO-25-000398
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-25-000398 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-03-17
Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-09-22
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-09-22
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-09-22
required mitigation
Install two 2.5" Caliper Type 1 Trees and one 3" penalty tree or pay into the applicable Tree Trust Fund for any trees not planted
Informational • 2025-05-13

Related Records1

BLD-23-0503749
Pending
BLDCO-25-000398
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →