• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0504046-REV1
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Complete
Description

This revision is intended to address the redlines in the conditional approval. See attached narrative letter

Owner
Richman East Tampa Mixed Income Llc
Address
2302 E HILLSBOROUGH AVE, TAMPA, FL 33610
Zoning
COMMUNITY COMMERCIAL-35 (2.0 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Richman East Tampa Mixed Income Llc
Parcel
1510480000
Value
$3,579,092.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1000
Zoning Acres:
147427.2752
FIRM Panel:
1201140016C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
001001
Population:
929

Preparing the map…

2302 E HILLSBOROUGH AVE, TAMPA, FL 33610

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-09-25
School concurrency certificate
School Concurrency approval required prior to approval of the Phase 2 vertical permit. Contact Renee Kamen (Renee.Kamen@hcps.net) or Glorimar.Belangia (Glorimar.Belangia@hcps.net) for approval status
Informational • 2023-12-12
Building - 1 Applied, 2 Released, 1 Complied - Building Permit - Steel Stair Manufacturer Shop Drawings
Manufactures steel stair details are required to be submitted for approval with a revision prior to the placement of the stairs. 5-106.1.1. Information on construction documents
Informational • 2024-03-06
Mechanical Permit Revision
Mechanical Permit Revision required prior to vertical construction
Informational • 2025-06-18

Related Records12

BLD-24-0504046-REV1
Complete
BLD-24-0504046-REV3
Complete
UTL-23-0001876
In Process
BLDLP-24-007215
Complete
BLD-24-0509993
Issued
BLD-24-0504046
Pending
BLDLP-24-002136
Complete
BLD-24-0504046-REV4
Complete
CBO-25-0000101
Complete
BLD-24-0504046-REV2
Complete
BLD-25-0512931
About to Expire
BLDLP-24-005665
Complete
BLD-24-0509334
In Process

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0504046-REV3 (related)
  • UTL-23-0001876 (related)
  • BLDLP-24-007215 (related)
  • BLD-24-0509993 (related)
  • BLD-24-0504046 (related)
  • BLDLP-24-002136 (related)
  • BLD-24-0504046-REV4 (related)
  • CBO-25-0000101 (related)
  • BLD-24-0504046-REV2 (related)
  • BLD-25-0512931 (related)
  • BLDLP-24-005665 (related)
  • BLD-24-0509334 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-09-25
School concurrency certificate
School Concurrency approval required prior to approval of the Phase 2 vertical permit. Contact Renee Kamen (Renee.Kamen@hcps.net) or Glorimar.Belangia (Glorimar.Belangia@hcps.net) for approval status
Informational • 2023-12-12
Building - 1 Applied, 2 Released, 1 Complied - Building Permit - Steel Stair Manufacturer Shop Drawings
Manufactures steel stair details are required to be submitted for approval with a revision prior to the placement of the stairs. 5-106.1.1. Information on construction documents
Informational • 2024-03-06
Mechanical Permit Revision
Mechanical Permit Revision required prior to vertical construction
Informational • 2025-06-18

Related Records12

BLD-24-0504046-REV1
Complete
BLD-24-0504046-REV3
Complete
UTL-23-0001876
In Process
BLDLP-24-007215
Complete
BLD-24-0509993
Issued
BLD-24-0504046
Pending
BLDLP-24-002136
Complete
BLD-24-0504046-REV4
Complete
CBO-25-0000101
Complete
BLD-24-0504046-REV2
Complete
BLD-25-0512931
About to Expire
BLDLP-24-005665
Complete
BLD-24-0509334
In Process
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →