Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-09-25
School concurrency certificate
School Concurrency approval required prior to approval of the Phase 2 vertical permit. Contact Renee Kamen (Renee.Kamen@hcps.net) or Glorimar.Belangia (Glorimar.Belangia@hcps.net) for approval status
Informational • 2023-12-12
Building - 1 Applied, 2 Released, 1 Complied - Building Permit - Steel Stair Manufacturer Shop Drawings
Manufactures steel stair details are required to be submitted for approval with a revision prior to the placement of the stairs. 5-106.1.1. Information on construction documents
Informational • 2024-03-06
Mechanical Permit Revision
Mechanical Permit Revision required prior to vertical construction
Informational • 2025-06-18