Building - 5 Applied, 1 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-05
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-10-05
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2023-11-07
Termite Cert
Termite Certification Required
Informational • 2023-11-07
Required mitigation and code trees.
Ch.27-284.4.1-A & Table 284.3.3 - Required mitigation and code trees. NATURAL RESOURCES Created by: Michael Lousias on 11/30/2023, 10:26:42 AM CONDITION Description: 10 type 1 trees are required as mitigation. 4 Code trees are required. Minimum planting standards; 30 Gallon, Florida Grade #1, 2.5" caliper, 8-10' tall, 5-6' spread
Informational • 2023-11-30