• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0504183
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Pending
Description

THRESHOLD *PRIVATE PROVIDER: PLAN REVIEW AND INSPECTIONS* MetWest Residential is an eight-story CMU and concrete multifamily apartment building with a restaurant shell space, and a 628 space cast-in-place parking garage. Amenities include a pool courtyard on the top of the parking garage, an aqua lounge overlooking the pool, a sunset deck with social club on the 8th floor, fitness, and dedicated co-working space. Trades Include: Bldg, MEP, Fire Protection

Owner
Metwest International Owner Llc
Address
4160 W BOY SCOUT BLVD, TAMPA, FL 33607
Zoning
REGIONAL MIXED USE-100 (3.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Metwest International Multifamily Owner Llc
Parcel
1120210674
Value
$3,125,709.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1003
Zoning Acres:
147427.2752
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004600
Population:
385

Preparing the map…

4160 W BOY SCOUT BLVD, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied, 1 Complied, 3 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-10
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-10-10
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2023-10-11
Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-24-0000008 for shoring and reshoring, aggregate piers, post-tension tendon layout and friction loss calculations, structural steel connections, storefront systems, cold-formed steel framing, and metal fabrications, including stairs, ladders, and railings. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by the revision record to the BLD record. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2024-02-20
NSF Fee Due
NSF Fee due - Original amount due on (bld-24-0504183-9) $522.75+ NSF Fee due $40 = Total amount due $562.75 Only charging the fee on one record as one time courtesy
Informational • 2024-09-17

Related Records

Track this permit to view related recordsStart Free Trial

Frequently Asked Questions

Related Links

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied, 1 Complied, 3 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-10
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-10-10
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2023-10-11
Building Plans - Deferred Submittals
The building official approves of the listed deferred submittal items presented in CBO-24-0000008 for shoring and reshoring, aggregate piers, post-tension tendon layout and friction loss calculations, structural steel connections, storefront systems, cold-formed steel framing, and metal fabrications, including stairs, ladders, and railings. The deferred submittal items shall not be installed until the deferred submittal documents have been approved by the revision record to the BLD record. The condition will be affirmatively noted on the record as a revision to the record and the revision will be required prior to the installation of said deferrals on site
Informational • 2024-02-20
NSF Fee Due
NSF Fee due - Original amount due on (bld-24-0504183-9) $522.75+ NSF Fee due $40 = Total amount due $562.75 Only charging the fee on one record as one time courtesy
Informational • 2024-09-17

Related Records

Track this permit to view related recordsStart Free Trial
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →