• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0504667
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 9, 2025
Status
Complete
Description

Building 14 Wood Replacement and Siding Tune Up

Job Value

$32,000.00

Owner
Cmf Iv Mode At Ballast Point Llc
Address
6306 S MACDILL AVE 1402-1431, TAMPA, FL 33611
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
AESFHABFE 10 ft
Advanced details
Owner
Cmf Iv Mode At Ballast Point Llc
Parcel
1363520000
Value
$46,883,200.00
Year Built
1988
Stories:
36
Units:
276
Buildings:
19
Land Use Code:
0320
Zoning Acres:
147427.2752
FIRM Panel:
1201140038C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
006900
Population:
532

Preparing the map…

6306 S MACDILL AVE 1402-1431, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 2 Released, 3 Not Applicable - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-30
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-12-27
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-12-27
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-12-27
Utilities - Certificate of Occupancy Hold for Water
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-03-13

Related Records

Track this permit to view related recordsStart Free Trial

Frequently Asked Questions

Related Links

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 2 Released, 3 Not Applicable - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-10-30
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2023-12-27
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-12-27
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-12-27
Utilities - Certificate of Occupancy Hold for Water
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-03-13

Related Records

Track this permit to view related recordsStart Free Trial
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →