• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0504916
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 4, 2025
Status
Pending
Description

Review for Site & Foundation. New commercial carwash w/trash enclosure.

Owner
Rc Sud Stop Tampa Busch Blvd Lp
Address
2525 E BUSCH BLVD FS, TAMPA, FL 33612
Zoning
COMMUNITY MIXED USE-35 (2.0 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Rc Sud Stop Tampa Busch Blvd Lp
Parcel
1472770100
Value
$822,103.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1000
Zoning Acres:
147427.2752
FIRM Panel:
1201140003C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
000800
Population:
105

Preparing the map…

2525 E BUSCH BLVD FS, TAMPA, FL 33612

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-11-08
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-11-08
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2023-11-08
DEMO Permit required prior to Issuance
Demolition permit has to be issued prior to issuing the Site and Foundation permit (BLD-24-0504916)
Informational • 2023-12-21
Termite Cert
Termite Certification Required
Informational • 2024-02-07

Related Records6

BLD-24-0504916
Pending
BDE-24-0443451
Complete
BLDLP-24-009394
Complete
BLD-24-0504916-REV1
Complete
UTL-24-0000226
In Process
BLDCO-24-000391
Complete
BLD-25-0513838
Revision

Frequently Asked Questions

Related Links

Related Permits

  • BDE-24-0443451 (related)
  • BLDLP-24-009394 (related)
  • BLD-24-0504916-REV1 (related)
  • UTL-24-0000226 (related)
  • BLDCO-24-000391 (related)
  • BLD-25-0513838 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 5 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-11-08
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-11-08
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2023-11-08
DEMO Permit required prior to Issuance
Demolition permit has to be issued prior to issuing the Site and Foundation permit (BLD-24-0504916)
Informational • 2023-12-21
Termite Cert
Termite Certification Required
Informational • 2024-02-07

Related Records6

BLD-24-0504916
Pending
BDE-24-0443451
Complete
BLDLP-24-009394
Complete
BLD-24-0504916-REV1
Complete
UTL-24-0000226
In Process
BLDCO-24-000391
Complete
BLD-25-0513838
Revision
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →