• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0505273
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Complete
Description

*2-STORIES: 4-UNIT BUILDING FEE SIMPLE TOWNHOUSES, ATTACHED GARAGE, REAR LANAI, COVERED ENTRY* Site and Infrastructure -BLD-23-0502473 NEW SINGLE FAMILY TOWNHOMES LOTS 32, 33, 34 & 35

Owner
Lennar Homes Llc
Address
10820 KEATO BEACH CT, TAMPA, FL 33647
Zoning
COMMUNITY COMMERCIAL-35 (2.0 FAR)
Risk
AEBFE 42.1 ft
Advanced details
Owner
Hunters Key Homeowners Assoc Inc
Parcel
0339700778
Value
$100.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0910
Zoning Acres:
147427.2752
FIRM Panel:
1201120230E
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
010211
Population:
1145

Preparing the map…

10820 KEATO BEACH CT, TAMPA, FL 33647

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 2 Complied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-11-28
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2025-01-03
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2025-01-03
Termite Cert
Termite Certification Required
Informational • 2025-05-06
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-07-10

Related Records4

BLD-24-0505273
Complete
BLDLP-24-009059
Complete
BLDLP-24-009144
Complete
BLD-23-0502473
Issued
BLD-24-0505271
Pending

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-009059 (related)
  • BLDLP-24-009144 (related)
  • BLD-23-0502473 (related)
  • BLD-24-0505271 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 2 Complied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-11-28
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2025-01-03
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2025-01-03
Termite Cert
Termite Certification Required
Informational • 2025-05-06
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2025-07-10

Related Records4

BLD-24-0505273
Complete
BLDLP-24-009059
Complete
BLDLP-24-009144
Complete
BLD-23-0502473
Issued
BLD-24-0505271
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →