• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0505461
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Pending
Description

*FEMA SFHA: LIMITED PRIVATE PROVIDER –INSPECTIONS ONLY. CITY OF TAMPA WILL TAKE LEAD INSPECTIONS UP TO REQUIRED DFE AND UNTIL SUCH TIME APPROVAL FOR REQUIRED UNDER-CONSTRUCTION ELEVATION CERTIFICATE IS OBTAINED. CITY OF TAMPA WILL PERFORM A FINAL INSPECTION ON ALL PROJECTS LOCATED IN A FEMA SFHA.* Vested under FBC 7th Edition. New construction residence per FBC. Includes guest suite, rear porch, garage 1 & 2, rear balcony, front porch.

Job Value

$1,890,000.00

Owner
Anthony Cirelli
Address
503 ERIE AVE, TAMPA, FL 33606
Zoning
RESIDENTIAL-6
Risk
AESFHABFE 10 ft
Advanced details
Owner
Anthony Cirelli
Parcel
1963470000
Value
$1,919,104.00
Year Built
2025
Stories:
2
Units:
0
Buildings:
1
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140033C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
005401
Population:
390

Preparing the map…

503 ERIE AVE, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-12-05
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2023-12-27
Private Provider Final Inspection Report Required
Private Provider Final Inspection Report Required
Informational • 2024-10-24
Building - 4 Applied, 1 Complied, 1 Not Applicable - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-06-26
Termite Cert
Termite Certification Required
Informational • 2025-07-03

Related Records5

BLD-24-0505461
Pending
UTL-24-0000359
In Process
BLD-24-0505462
Pending
BLDLP-24-009202
Complete
BLDLP-25-002404
Complete
BLD-24-0505462-REV1
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-24-0000359 (related)
  • BLD-24-0505462 (related)
  • BLDLP-24-009202 (related)
  • BLDLP-25-002404 (related)
  • BLD-24-0505462-REV1 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-12-05
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2023-12-27
Private Provider Final Inspection Report Required
Private Provider Final Inspection Report Required
Informational • 2024-10-24
Building - 4 Applied, 1 Complied, 1 Not Applicable - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-06-26
Termite Cert
Termite Certification Required
Informational • 2025-07-03

Related Records5

BLD-24-0505461
Pending
UTL-24-0000359
In Process
BLD-24-0505462
Pending
BLDLP-24-009202
Complete
BLDLP-25-002404
Complete
BLD-24-0505462-REV1
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →