• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0505711
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Complete
Description

Alteration of media center in existing building. New layout and finishes to be applied, relocation of some electrical and hvac grills. Trades include: Bldg, Electrical, Mechanical, Fire Alarm. Early Start: Interior non-structural work only up to the first rough-in inspection.

Job Value

$370,000.00

Owner
First Park Owner Lp
Address
3302 W DR MARTIN LUTHER KING JR BLVD, TAMPA, FL 33607
Zoning
URBAN MIXED USE-60 (3.25 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
First Allied Development Partners Lp
Parcel
1094920100
Value
$26,874,200.00
Year Built
2006
Stories:
4
Units:
0
Buildings:
3
Land Use Code:
1217
Zoning Acres:
147427.2752
FIRM Panel:
1201140014C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
002700
Population:
110

Preparing the map…

3302 W DR MARTIN LUTHER KING JR BLVD, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Attractions & Recreational Facility (BUCS Training Facility)
Informational • 2016-07-21
Utilities - Utility Application Submittal
A Utility application is not required
Informational • 2024-02-19
Wastewater Commitment Required
A Wastewater Commitment is not required for HVAC or Electrical or Fire related piping
Informational • 2024-02-19
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2024-02-19
Building - 4 Not Applicable, 1 Applied, 2 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-22

Related Records2

BLD-24-0505711
Complete
BLDCO-24-000242
Complete
BLDLP-24-004118
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-24-000242 (related)
  • BLDLP-24-004118 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building Plans - SECURE PLANS
Attractions & Recreational Facility (BUCS Training Facility)
Informational • 2016-07-21
Utilities - Utility Application Submittal
A Utility application is not required
Informational • 2024-02-19
Wastewater Commitment Required
A Wastewater Commitment is not required for HVAC or Electrical or Fire related piping
Informational • 2024-02-19
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2024-02-19
Building - 4 Not Applicable, 1 Applied, 2 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-22

Related Records2

BLD-24-0505711
Complete
BLDCO-24-000242
Complete
BLDLP-24-004118
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →