• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0505902
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Complete
Description

"*FEMA SFHA: LIMITED PRIVATE PROVIDER – PLAN REVIEW AND INSPECTIONS. CITY OF TAMPA WILL TAKE LEAD ON REVIEWS FOR ALL ITEMS UP TO THE REQUIRED DFE AND INSPECTIONS UP TO REQUIRED DFE AND UNTIL SUCH TIME APPROVAL FOR REQUIRED UNDER-CONSTRUCTION ELEVATION CERTIFICATE IS OBTAINED. CITY OF TAMPA WILL PERFORM A FINAL INSPECTION ON ALL PROJECTS LOCATED IN A FEMA SFHA.*" -Vested under the 7th Edition- New 3 story SFR with 5beds/5baths with garage, golf cart storage, lanai, elevator New single family residence

Job Value

$900,000.00

Owner
Wdc Contracting Llc
Address
500 E DAVIS BLVD A-B, TAMPA, FL 33606
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
AESFHABFE 10 ft
Advanced details
Owner
Wdc Contracting Llc
Parcel
1959710000
Value
$475,728.00
Year Built
2025
Stories:
3
Units:
0
Buildings:
1
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140033C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
005401
Population:
62

Preparing the map…

500 E DAVIS BLVD A-B, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 4 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-12-21
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-12-21
Termite Cert
Termite Certification Required
Informational • 2025-04-25
Flood Certificate Required
Flood Certificate Required
Informational • 2025-04-29
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-05-07

Related Records7

BLD-24-0505902
Complete
BLD-24-0505902-REV1
Complete
BLD-23-0503909
Pending
BLDLP-25-000896
Complete
BLDCO-24-000209
Complete
UTL-24-0000480
In Progress
BLDCO-24-000260
Complete
BLDLP-24-009179
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0505902-REV1 (related)
  • BLD-23-0503909 (related)
  • BLDLP-25-000896 (related)
  • BLDCO-24-000209 (related)
  • UTL-24-0000480 (related)
  • BLDCO-24-000260 (related)
  • BLDLP-24-009179 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 4 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-12-21
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2023-12-21
Termite Cert
Termite Certification Required
Informational • 2025-04-25
Flood Certificate Required
Flood Certificate Required
Informational • 2025-04-29
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-05-07

Related Records7

BLD-24-0505902
Complete
BLD-24-0505902-REV1
Complete
BLD-23-0503909
Pending
BLDLP-25-000896
Complete
BLDCO-24-000209
Complete
UTL-24-0000480
In Progress
BLDCO-24-000260
Complete
BLDLP-24-009179
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →