• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0505929
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Pending
Description

Vested under the 7th Edition SITE AND FOUNDATION PERMIT FOR A NEW 14-STORY, 360 APARTMENT BUILDING UNITS WITH AMENITY AREAS AND A STREET LEVEL COMMERCIAL RESTAURANT SPACE. THE PROJECT IS MADE UP OF TWO 14 STORY TOWERS CONNECTED BY A 6 STORY PARKING GARAGE WITH 4 STORIES OF UNITS ABOVE.

Owner
Ally 1515 Llc
Address
1515 N WEST SHORE BLVD, TAMPA, FL 33607
Zoning
REGIONAL MIXED USE-100 (3.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Ally 1515 Llc
Parcel
1121310000
Value
$5,400,000.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
1003
Zoning Acres:
147427.2752
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004600
Population:
0

Preparing the map…

1515 N WEST SHORE BLVD, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-12-22
Demolition Placard Required
A demolition placard is required on this record
Informational • 2023-12-22
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-12-22
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-12-22
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-12-22

Related Records11

BLD-24-0505929
Pending
BLDLP-24-005360
Complete
BLD-24-0505925
Complete
PPR-23-0000061
Complete
PPR-23-0000044
Complete
BLDCO-24-000327
Complete
UTL-24-0000478
Pending
BLDLP-24-004670
Complete
BLD-24-0505925-REV1
Complete
UTL-24-0000463
In Progress
BLDCO-24-000165
Complete
BDE-24-0443380
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-005360 (related)
  • BLD-24-0505925 (related)
  • PPR-23-0000061 (related)
  • PPR-23-0000044 (related)
  • BLDCO-24-000327 (related)
  • UTL-24-0000478 (related)
  • BLDLP-24-004670 (related)
  • BLD-24-0505925-REV1 (related)
  • UTL-24-0000463 (related)
  • BLDCO-24-000165 (related)
  • BDE-24-0443380 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2023-12-22
Demolition Placard Required
A demolition placard is required on this record
Informational • 2023-12-22
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2023-12-22
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2023-12-22
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2023-12-22

Related Records11

BLD-24-0505929
Pending
BLDLP-24-005360
Complete
BLD-24-0505925
Complete
PPR-23-0000061
Complete
PPR-23-0000044
Complete
BLDCO-24-000327
Complete
UTL-24-0000478
Pending
BLDLP-24-004670
Complete
BLD-24-0505925-REV1
Complete
UTL-24-0000463
In Progress
BLDCO-24-000165
Complete
BDE-24-0443380
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →