Revised Scope of Work: 1- Proposed (3) 1.75"x9.35" front roof glulam beam were change to (2) 1.75"x9.25" 2.0E Microlam LVL Beam 2- Proposed (3) 1.75"x9.35" left & right glulam beam were change to (2) 2"x10" S.Y.P. #2 Beam 3- Proposed (3) 1.75"x9.35" glulam ridge beam were change to (3) 2"x10" S.Y.P. #2 Beam 4- Proposed 8"x8" P.T. Post were changed to 6"x6" S.Y.P. #2 Post 5- Proposed 2"x4" roof rafters were changed to 2"x6" S.Y.P. #2 roof rafters 6- Additional Simpson ties were included: H10A, MTS12, BC60, PS418.