• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0507534
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Pending
Description

ATF--CMP-23-0000781 Upon purchasing this property, it became evident that the previous owner had converted the exterior outbuilding into a workspace without proper permits. Consequently, a stop work order has been issued. To rectify this situation, I am requesting a new after-the-fact permit, which will supersede the previous one (BLD-23-0499059). I am submitting comprehensive plans along with an engineer's inspection report confirming that the workspace is now up to code.

Job Value

$5,000.00

Owner
Mi Herrera Group Llc
Address
9301 N 16TH ST, TAMPA, FL 33612
Zoning
RESIDENTIAL-10 (.35 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Mi Gente Real Estate Llc
Parcel
1443180000
Value
$289,451.00
Year Built
1972
Stories:
2
Units:
2
Buildings:
2
Land Use Code:
0100
Zoning Acres:
147427.2752
FIRM Panel:
1201140002C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
000300
Population:
33

Preparing the map…

9301 N 16TH ST, TAMPA, FL 33612

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-03-30
Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-03-15
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-03-15
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-03-15
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2024-03-15

Related Records3

BLD-24-0507534
Pending
BLD-24-0506808
Pending
BLD-24-0507535
Pending
BLDLP-24-009670
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-24-0506808 (related)
  • BLD-24-0507535 (related)
  • BLDLP-24-009670 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2023-03-30
Building - 8 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-03-15
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-03-15
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-03-15
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2024-03-15

Related Records3

BLD-24-0507534
Pending
BLD-24-0506808
Pending
BLD-24-0507535
Pending
BLDLP-24-009670
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →