• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0507707
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Pending
Description

Interior remodel of a condo.

Job Value

$10,000.00

Owner
Shane Bullough/Trustee
Address
2103 BAYSHORE BLVD 504, TAMPA, FL 33606
Zoning
RESIDENTIAL-83 (.65 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Shane Bullough/trustee
Parcel
1176651256
Value
$1,721,319.00
Year Built
2022
Stories:
1
Units:
1
Buildings:
0
Land Use Code:
0400
Zoning Acres:
147427.2752
FIRM Panel:
1201140032C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
006101
Population:
148

Preparing the map…

2103 BAYSHORE BLVD 504, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

NSF (eCheck) - Fees Due
NSF eCheck - "uncollected funds" BLD-17-0453234 ($624.75 + $40 fee = $664.75 total due)
Informational • 2018-01-26
Building - 2 Applied, 6 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-03-22
Utilities - Certificate of Occupancy Hold for Water (backflow)
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net. (meter #'s 22025596, 21306332, and FL-69243)
Informational • 2024-05-06
Utility Application Submittal
A utility service application is not required for this project
Informational • 2024-05-07
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2024-05-07

Related Records5

BLD-24-0507707
Pending
BLDLP-25-005483
Complete
BLDLP-24-006670
Complete
BLDLP-24-009377
Complete
BLDLP-24-009364
Complete
BLDLP-24-008404
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-25-005483 (related)
  • BLDLP-24-006670 (related)
  • BLDLP-24-009377 (related)
  • BLDLP-24-009364 (related)
  • BLDLP-24-008404 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

NSF (eCheck) - Fees Due
NSF eCheck - "uncollected funds" BLD-17-0453234 ($624.75 + $40 fee = $664.75 total due)
Informational • 2018-01-26
Building - 2 Applied, 6 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-03-22
Utilities - Certificate of Occupancy Hold for Water (backflow)
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net. (meter #'s 22025596, 21306332, and FL-69243)
Informational • 2024-05-06
Utility Application Submittal
A utility service application is not required for this project
Informational • 2024-05-07
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid
Informational • 2024-05-07

Related Records5

BLD-24-0507707
Pending
BLDLP-25-005483
Complete
BLDLP-24-006670
Complete
BLDLP-24-009377
Complete
BLDLP-24-009364
Complete
BLDLP-24-008404
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →