• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0507902
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Pending
Description

"*PRIVATE PROVIDER – INSPECTIONS ONLY* Detailed description of work." Construction of a new fee simple townhouse 2-stories, carport, front and rear patio Re-opened - Original Application Acceptance Date: 04/04/2024

Job Value

$685,000.00

Owner
Oneil Equities Llc
Address
1405 E LOUISIANA AVE 1, TAMPA, FL 33603
Zoning
RESIDENTIAL-20 (.50 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
1405 Louisiana Ave Llc
Parcel
1718870000
Value
$42,244.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140015C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
002100
Population:
46

Preparing the map…

1405 E LOUISIANA AVE 1, TAMPA, FL 33603

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-02
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-04-02
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2024-04-02
Termite Cert
Termite Certification Required
Informational • 2024-05-30
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-02-21

Related Records13

BLD-24-0507902
Pending
BLDCO-25-001826
Complete
BLDLP-25-003533
Complete
UTL-24-0000985
In Process
BLDCO-24-000577
Complete
BLDLP-25-004701
Complete
BLDLP-25-003532
Complete
BLDCO-24-000578
Complete
BLDLP-25-004700
Complete
BLD-24-0507903
Pending
UTL-24-0000987
In Process
BDE-24-0443431
Complete
BLDLP-25-004699
Complete
BLDCO-25-001827
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-25-001826 (related)
  • BLDLP-25-003533 (related)
  • UTL-24-0000985 (related)
  • BLDCO-24-000577 (related)
  • BLDLP-25-004701 (related)
  • BLDLP-25-003532 (related)
  • BLDCO-24-000578 (related)
  • BLDLP-25-004700 (related)
  • BLD-24-0507903 (related)
  • UTL-24-0000987 (related)
  • BDE-24-0443431 (related)
  • BLDLP-25-004699 (related)
  • BLDCO-25-001827 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 4 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-02
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-04-02
Default - 1 Complied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2024-04-02
Termite Cert
Termite Certification Required
Informational • 2024-05-30
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-02-21

Related Records13

BLD-24-0507902
Pending
BLDCO-25-001826
Complete
BLDLP-25-003533
Complete
UTL-24-0000985
In Process
BLDCO-24-000577
Complete
BLDLP-25-004701
Complete
BLDLP-25-003532
Complete
BLDCO-24-000578
Complete
BLDLP-25-004700
Complete
BLD-24-0507903
Pending
UTL-24-0000987
In Process
BDE-24-0443431
Complete
BLDLP-25-004699
Complete
BLDCO-25-001827
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →