• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0508185
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 10, 2025
Status
Complete
Description

Interior Remodel: Kitchen- demo millwork and install new can lights, outlets, switches, sink, fridge, recirculating hood, range, cabinets, and countertops. Powder room - new vanity light and exhaust fan. Master bath - demo tub, remove single vanity and install a double, new shower with existing drain location, new sconces, toilet, switches, and lights. Per FBC 8th edition, 2023.

Job Value

$110,865.00

Owner
Brock Mason Guzman And Rebecca Guzman
Address
2109 BAYSHORE BLVD 1005, TAMPA, FL 33606
Zoning
RESIDENTIAL-83 (.65 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Don Michael And Doris Okeon Jackson/trustee
Parcel
1863175178
Value
$274,874.00
Year Built
1924
Stories:
1
Units:
1
Buildings:
0
Land Use Code:
0400
Zoning Acres:
147427.2752
FIRM Panel:
1201140032C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
006101
Population:
148

Preparing the map…

2109 BAYSHORE BLVD 1005, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-12
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-04-17
Wastewater Commitment Required
Wastewater review not required for interior remodel
Informational • 2024-04-17
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2024-04-17
Building - 2 Applied, 5 Released - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2024-09-05

Related Records5

BLD-24-0508185
Complete
BLDLP-24-008890
Complete
BLD-24-0508185-REV1
Complete
BLDLP-24-010254
Complete
BLDLP-24-010125
Complete
BLDLP-24-006945
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-008890 (related)
  • BLD-24-0508185-REV1 (related)
  • BLDLP-24-010254 (related)
  • BLDLP-24-010125 (related)
  • BLDLP-24-006945 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-04-12
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-04-17
Wastewater Commitment Required
Wastewater review not required for interior remodel
Informational • 2024-04-17
Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid
Informational • 2024-04-17
Building - 2 Applied, 5 Released - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2024-09-05

Related Records5

BLD-24-0508185
Complete
BLDLP-24-008890
Complete
BLD-24-0508185-REV1
Complete
BLDLP-24-010254
Complete
BLDLP-24-010125
Complete
BLDLP-24-006945
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →