• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0508497
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 4, 2025
Status
Pending
Description

Unit 17001. Condo Renovation, remodel bathrooms, removing and adding walls, adding ceiling details and lighting, new doors, flooring

Owner
Marina Pointe East Developer Llc
Address
5120 MARINA WAY, TAMPA, FL 33611
Zoning
URBAN MIXED USE-60 (3.25 FAR)
Risk
AESFHABFE 9 ft
Advanced details
Owner
Marina Pointe East Developer Llc
Parcel
1324274746
Value
$100.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0902
Zoning Acres:
147427.2752
FIRM Panel:
1201140036C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
007102
Population:
150

Preparing the map…

5120 MARINA WAY, TAMPA, FL 33611

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Utilities - Certificate of Occupancy Hold for Water - Cross Connection Inspection (Backflow)
The Water Department has determined that the existing 3” domestic meter (Ser. No. 20115692) is adequate for the proposed project with no change in ERCs and no utility application is required. The Water Commitment hold on the BLD has been released. Both the domestic and irrigation backflows are not compliant with annual testing and we are not showing record of backflow tests for the fire line (one for the main device and one for the by-pass). All four (4) backflow tests must be submitted and accepted in SwiftComply prior to C/O. A hold will remain until this requirement is satisfied. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-05-17
Building - 2 Applied, 1 Not Applicable, 5 Released - Building Permit - Special Inspector
Threshold building with Special Inspector assigned
Informational • 2024-08-19
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-08-19
Utility Application Submittal
Water has determined that existing services are adequate for this project. No Utility application is required. If you have any questions, comments, or concerns, please contact William Hernandez at William.Hernandez@tampagov.net
Informational • 2024-08-22
Wastewater Commitment Required
Water Department has determined that existing services are adequate for this project. Scope of work does not require wastewater review. If you have any questions, comments, or concerns, please contact William Hernandez at William.Hernandez@tampagov.net
Informational • 2024-08-22

Related Records3

BLD-24-0508497
Pending
BLDLP-24-010482
Complete
BLDLP-24-009052
Complete
BLDLP-25-000321
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-010482 (related)
  • BLDLP-24-009052 (related)
  • BLDLP-25-000321 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Utilities - Certificate of Occupancy Hold for Water - Cross Connection Inspection (Backflow)
The Water Department has determined that the existing 3” domestic meter (Ser. No. 20115692) is adequate for the proposed project with no change in ERCs and no utility application is required. The Water Commitment hold on the BLD has been released. Both the domestic and irrigation backflows are not compliant with annual testing and we are not showing record of backflow tests for the fire line (one for the main device and one for the by-pass). All four (4) backflow tests must be submitted and accepted in SwiftComply prior to C/O. A hold will remain until this requirement is satisfied. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net
Informational • 2024-05-17
Building - 2 Applied, 1 Not Applicable, 5 Released - Building Permit - Special Inspector
Threshold building with Special Inspector assigned
Informational • 2024-08-19
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-08-19
Utility Application Submittal
Water has determined that existing services are adequate for this project. No Utility application is required. If you have any questions, comments, or concerns, please contact William Hernandez at William.Hernandez@tampagov.net
Informational • 2024-08-22
Wastewater Commitment Required
Water Department has determined that existing services are adequate for this project. Scope of work does not require wastewater review. If you have any questions, comments, or concerns, please contact William Hernandez at William.Hernandez@tampagov.net
Informational • 2024-08-22

Related Records3

BLD-24-0508497
Pending
BLDLP-24-010482
Complete
BLDLP-24-009052
Complete
BLDLP-25-000321
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →