• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0508743
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Pending
Description

New construction 3sty 2 Family dwelling 3bed/4ba, entry, patio, attached garage. Unit 2 Re-opened - Original Application Acceptance Date: 07/01/2024

Job Value

$648,000.00

Owner
Brodsky Property Holdings Llc
Address
6815 S FAUL ST 2, TAMPA, FL 33616
Risk
—
Advanced details
Owner
—
Parcel
—
Value
—

Preparing the map…

6815 S FAUL ST 2, TAMPA, FL 33616

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 9 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-05-07
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-05-07
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-05-07
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2024-07-22
Termite Cert
Termite Certification Required
Informational • 2024-07-22

Related Records7

BLD-24-0508743
Pending
UTL-24-0000957
Closed
BLDLP-24-008329
Complete
BLD-24-0507781
Complete
BLDLP-24-008314
Complete
BLDLP-24-009477
Complete
BDE-24-0443612
Complete
BLDLP-24-010308
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-24-0000957 (related)
  • BLDLP-24-008329 (related)
  • BLD-24-0507781 (related)
  • BLDLP-24-008314 (related)
  • BLDLP-24-009477 (related)
  • BDE-24-0443612 (related)
  • BLDLP-24-010308 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 9 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-05-07
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-05-07
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued
Informational • 2024-05-07
Flood Elevation Certificate Required
Flood Elevation Certificate Required
Informational • 2024-07-22
Termite Cert
Termite Certification Required
Informational • 2024-07-22

Related Records7

BLD-24-0508743
Pending
UTL-24-0000957
Closed
BLDLP-24-008329
Complete
BLD-24-0507781
Complete
BLDLP-24-008314
Complete
BLDLP-24-009477
Complete
BDE-24-0443612
Complete
BLDLP-24-010308
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →