Suspension
Per HC-CMP-21-0000420 – Contractor has lost his permitting privileges in the City of Tampa, and Temple Terrace for 6 months (through 9/11/2022)
Informational • 2023-02-28
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-05-19
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied
Informational • 2024-05-19
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-05-19
Building - 4 Applied, 1 Complied - Building Permit - Tree Removal w/o permit T/F & Mitigation Req.
Tree removal without a permit. Triple permit fee and mitigation per the tree table plus penalty trees based on size
Informational • 2025-05-21