Previously permitted 600 amp upgrade would not fit on the existing meter bank wall. After a site meeting with Teco the Utility Company, their recommendation was to bring a new 600 amp service the short distance from the existing transformer to the specified location on plans. We hope this revision can be reviewed as quickly as possible as the construction team is finalizing the project.”