• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0509130
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Pending
Description

Phase 1-Master Site. New Construction of a 3 Story 2 UNIT Single Family Detached Townhome. 2-Unit Townhouse to be permitted under this record - master site for all 7 units included on this record. The 5-Unit structure is permitted under BLD-24-0509131

Owner
2709 N Tampa Llc
Address
2711 N TAMPA ST 1-2, TAMPA, FL 33602
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Jbi Sunshine State Construction Llc
Parcel
1827210000
Value
$336,442.00
Acreage:
0.36
Land Use Code:
1000
Land Use Group:
VACANT COMM.
Zoning Acres:
147440.3701
FIRM Panel:
1201140024C
Flood Source:
12057C_STUDY5
Census Tract:
002900
Population:
11
Legal Description

Orange Park Plat 1 Pg 104, Lots 4 And 5 Block 2

Preparing the map…

2711 N TAMPA ST 1-2, TAMPA, FL 33602

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-05-23
Demolition Placard Required
A demolition placard is required on this record
Informational • 2024-05-23
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-05-23
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-05-23
Building - 5 Applied - Building Permit - Termite certificate
Termite certificate required before "CO"
Informational • 2024-06-28

Related Records5

BLD-24-0509130
Pending
UTL-24-0001648
Closed
UTL-24-0001408
Awaiting Client Reply
UTL-24-0001400
Awaiting Client Reply
UTL-24-0001401
Awaiting Client Reply
BLD-24-0509131
Pending

Frequently Asked Questions

Related Links

Related Permits

  • UTL-24-0001648 (related)
  • UTL-24-0001408 (related)
  • UTL-24-0001400 (related)
  • UTL-24-0001401 (related)
  • BLD-24-0509131 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-05-23
Demolition Placard Required
A demolition placard is required on this record
Informational • 2024-05-23
Utilities - Water Commitment Required
A Water Commitment may be required for this building project. Upon review of the Utility application, If the Water department determines that a Water Commitment is required, the Building permit will not be issued until the Water Commitment is issued and all related Utility fees are paid. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-05-23
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied
Informational • 2024-05-23
Building - 5 Applied - Building Permit - Termite certificate
Termite certificate required before "CO"
Informational • 2024-06-28

Related Records5

BLD-24-0509130
Pending
UTL-24-0001648
Closed
UTL-24-0001408
Awaiting Client Reply
UTL-24-0001400
Awaiting Client Reply
UTL-24-0001401
Awaiting Client Reply
BLD-24-0509131
Pending
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →