• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0509886
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Complete
Description

Interior build out to plans for slab, MEP, and finish -New Construction of site, foundation and shell-BLD-23-0501135

Job Value

$400,000.00

Owner
Primrose Lake Circle Real Estate Holding Llc
Address
5392 PRIMROSE LAKE CIR, TAMPA, FL 33647
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Primrose Lake Circle Real Estate Holding Llc
Parcel
0335831715
Value
$261,083.00
Square Feet
7788
Year Built
2025
Stories:
1
Buildings:
1
Acreage:
0.61
Land Use Code:
1000
Land Use Group:
VACANT COMM.
Zoning Acres:
147440.3701
FIRM Panel:
1201120070E
Flood Source:
12057C_STUDY5
Census Tract:
011008
Legal Description

Tampa Technology Park West-Flex B, A Portion Of Lots B1 And B2 Desc As Follows:, Beg At Swly Cor Of Lot B2 Thn Curve Left Rad, 430 Ft Cb N 08 Deg 18 Min 48 Sec E 53.13 Ft Thn

Preparing the map…

5392 PRIMROSE LAKE CIR, TAMPA, FL 33647

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 6 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-06-25
Utilities - Water Commitment Required
A Water Commitment has been issued under UTL-24-0001308
Informational • 2025-07-23
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-07-23
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-07-23
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-07-23

Related Records10

BLD-24-0509886
Complete
BLDLP-24-009589
Complete
UTL-23-0001394
In Process
BLD-23-0501135-REV1
Complete
BLD-23-0501135
Complete
BLDLP-25-003992
Complete
BLD-23-0501135-REV2
Complete
BLDLP-25-004452
Complete
UTL-24-0000070
Complete
BLDLP-24-009590
Complete
UTL-24-0001308
Closed

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-009589 (related)
  • UTL-23-0001394 (related)
  • BLD-23-0501135-REV1 (related)
  • BLD-23-0501135 (related)
  • BLDLP-25-003992 (related)
  • BLD-23-0501135-REV2 (related)
  • BLDLP-25-004452 (related)
  • UTL-24-0000070 (related)
  • BLDLP-24-009590 (related)
  • UTL-24-0001308 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 6 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-06-25
Utilities - Water Commitment Required
A Water Commitment has been issued under UTL-24-0001308
Informational • 2025-07-23
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-07-23
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-07-23
Certificate of Occupancy Hold for Water
If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-07-23

Related Records10

BLD-24-0509886
Complete
BLDLP-24-009589
Complete
UTL-23-0001394
In Process
BLD-23-0501135-REV1
Complete
BLD-23-0501135
Complete
BLDLP-25-003992
Complete
BLD-23-0501135-REV2
Complete
BLDLP-25-004452
Complete
UTL-24-0000070
Complete
BLDLP-24-009590
Complete
UTL-24-0001308
Closed
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →