Razed/Cleared
Building Condition Code: 07
Informational • 2015-01-11
Building - 6 Applied, 1 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-03
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-07-03
Utilities - Certificate of Occupancy Hold for Water - Affordable Housing
The City of Tampa Water Department has invested in the treatment and transmission infrastructure to provide the capacity to serve growth. Pursuant to Section 26-37, City of Tampa Code, an additional fee to account for the investment of the treatment and transmission infrastructure, which is calculated by multiplying $1,713 by the number of Equivalent Residential Units (ERUs) associated with the project. Per Florida Statute 163.31801, the City may provide an exception or waiver for the Water Capacity Fee for a development or construction that is affordable, as defined in Florida Statute 420.9071. Per Section 26-37, City of Tampa Code, it shall be the applicant's responsibility to provide official documents sufficient to demonstrate that a proposed development qualifies under the Florida Statute's definition. This project is currently under review by the City of Tampa for a final designation as "affordable". The water capacity fees will be waived once the required documentation is provided to the Water Department
Informational • 2024-08-12
Sprinkler system
Report and approval from the Fire Marshal prior to CO, verifying that the sprinkler system will meet the required pressure through connection to the City water system
Informational • 2025-04-21