Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-07-18
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-19
Building - 4 Applied - Building Permit - Termite Condition
—
Informational • 2024-07-24
Paver hold harmles
Paver hold harmless is incomplete. They did not complete section B, for "Paver Driveway". Is okay to continue approval of building permit, and corrected form will be required to be uploaded, complete, notarized and recorded before final inspection
Informational • 2025-02-06