• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0510425
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Pending
Description

New SFR front porch and a car garage.

Job Value

$250,000.00

Owner
John Gavrian And Demetrius Brophy
Address
2307 N 48TH ST, TAMPA, FL 33605
Zoning
RESIDENTIAL-20 (.50 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
John Gavrian And Demetrius Brophy
Parcel
1606520000
Value
$34,425.00
0
Stories:
0
Units:
0
Buildings:
0
Land Use Code:
0000
Zoning Acres:
147427.2752
FIRM Panel:
1201140026C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
003700
Population:
33

Preparing the map…

2307 N 48TH ST, TAMPA, FL 33605

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

NSF (eCheck) - Fees Paid
NSF eCheck "no account/unable to locate account" - 3 separate projects (see additional info below for details) Lock may not be removed until all 3 have been satisfied
Informational • 2017-09-06
Building - 7 Applied, 1 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-23
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-07-23
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-07-23
Termite Cert
Termite Certification Required
Informational • 2024-09-12

Related Records5

BLD-24-0510425
Pending
BLDLP-24-006686
Complete
BLDLP-24-008913
Complete
UTL-24-0001740
Awaiting Client Reply
BLDCO-25-001726
Complete
BDE-24-0443582
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-24-006686 (related)
  • BLDLP-24-008913 (related)
  • UTL-24-0001740 (related)
  • BLDCO-25-001726 (related)
  • BDE-24-0443582 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

NSF (eCheck) - Fees Paid
NSF eCheck "no account/unable to locate account" - 3 separate projects (see additional info below for details) Lock may not be removed until all 3 have been satisfied
Informational • 2017-09-06
Building - 7 Applied, 1 Complied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-23
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-07-23
Utilities - Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-07-23
Termite Cert
Termite Certification Required
Informational • 2024-09-12

Related Records5

BLD-24-0510425
Pending
BLDLP-24-006686
Complete
BLDLP-24-008913
Complete
UTL-24-0001740
Awaiting Client Reply
BLDCO-25-001726
Complete
BDE-24-0443582
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →