• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0510470
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Complete
Description

Interior Renovation and downsize of suite 450. The downsize includes the introduction of a new tenant demising wall and a new exit door location in the downsized suite. All new interior finishes are to match the existing.

Job Value

$145,260.80

Owner
Highwoods Realty Limited Partnership
Address
4300 W CYPRESS ST, TAMPA, FL 33607
Zoning
REGIONAL MIXED USE-100 (3.5 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Highwoods Realty Limited Partnership
Parcel
1150010000
Value
$28,949,800.00
Year Built
1986
Stories:
17
Units:
0
Buildings:
2
Land Use Code:
1810
Zoning Acres:
147427.2752
FIRM Panel:
1201140022C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004600
Population:
0

Preparing the map…

4300 W CYPRESS ST, TAMPA, FL 33607

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-24
Utility Application Submittal
Both Wastewater and Water Commitment holds have been released
Informational • 2024-07-30
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-07-30
Water Commitment Required
The Water Department has determined that the existing 2” domestic meter (Ser. No. 31584691) is adequate for the proposed project with no change in use and minimal plumbing changes. Backflows are compliant with annual testing. All Water holds have been released
Informational • 2024-07-30
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-08-21

Related Records4

BLD-24-0510470
Complete
BLDCO-24-001587
Complete
BLDLP-24-009934
Complete
BLDLP-24-010044
Complete
BLDLP-24-010062
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDCO-24-001587 (related)
  • BLDLP-24-009934 (related)
  • BLDLP-24-010044 (related)
  • BLDLP-24-010062 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-07-24
Utility Application Submittal
Both Wastewater and Water Commitment holds have been released
Informational • 2024-07-30
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-07-30
Water Commitment Required
The Water Department has determined that the existing 2” domestic meter (Ser. No. 31584691) is adequate for the proposed project with no change in use and minimal plumbing changes. Backflows are compliant with annual testing. All Water holds have been released
Informational • 2024-07-30
Utilities - Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-08-21

Related Records4

BLD-24-0510470
Complete
BLDCO-24-001587
Complete
BLDLP-24-009934
Complete
BLDLP-24-010044
Complete
BLDLP-24-010062
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →