Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2024-08-19
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-11-08
Stop Work Order
All construction work is required to cease until terms and conditions of order are satisfied. FBC Existing 702.6, FBC Existing 303.2, FBC (Building)107.3.5 & FBC 1403.4 The construction documents lack the necessary details to construct the code required fire rated assemblies and the current assemblies lack the necessary continuity of a rated assembly. Please consult your design professional and plan reviewer (Manuel Zambrano), in order to obtain an accurate revision with all required information. Once the approved revision has been approved, the SWO can be released, then the necessary corrections can be performed, and the associated inspection scheduled.”
Informational • 2025-01-31
Stop Work Order
All construction work is required to cease until terms and conditions of Order are satisifed
Informational • 2025-02-04
Building - 4 Applied, 6 Not Applicable - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-02-26