*PRIVATE PROVIDER - INSPECTIONS ONLY* Electrical Temp Power Plan - Set CT Meter and Prewire a 2000A 277/480V Service 07/30/2025: Power is expected to transfer over from this temp power source by Sept 2026. Advised applicant to have Electrical Contractor request an extension to this expired permit no later than mid-December 2026 to allow time for the transfer in case it goes into 2027 (the following building code cycle; there have been no previous extensions) -Z
$40,000.00