• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-24-0511053
JurisdictionTampa City
CategoryBuilding
Last CheckedAug 11, 2025
Status
Complete
Description

THIS PROJECT SCOPE INCLUDES RENOVATION OF APPROXIMATELY 1510SF FOR AN CENTRAL MONITORING RENOVATION. INFRASTRUCTURE UPGRADES INCLUDE HVAC WORK (, REPLACE DUCTWORK, RECONFIGURE AND CLEAN DUCTWORK. RECONFIGURE PLUMBING, ELECTRICAL AND LOW VOLTAGE TO ACCOMMODATE NEW WORK. FINISHES WILL BE UPGRADES THROUGHOUT THE AREA. NO MORE THAN ONE CONSTRUCTION PHASES IS ANTICIPATED FOR THIS PROJECT .Location of construction: East Pavilion, E101-E111.

Job Value

$174,374.80

Owner
Hillsborough County Hospital Authority
Address
1 TAMPA GENERAL CIR, TAMPA, FL 33606
Zoning
PUBLIC/SEMI-PUBLIC
Risk
AESFHABFE 10 ft
Advanced details
Owner
Hillsborough County Hospital Authority
Parcel
1962850050
Value
$367,679,167.00
Year Built
1927
Stories:
79
Units:
0
Buildings:
15
Land Use Code:
8510
Zoning Acres:
147427.2752
FIRM Panel:
1201140024C
Flood Source:
12057C_FIS1
Floodway:
false
Census Tract:
005401
Population:
0

Preparing the map…

1 TAMPA GENERAL CIR, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 6 Released - Building Permit - SECURED PLANS
TGH - SITE SIZE
Informational • 2017-01-18
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-08-27
Wastewater Commitment Required
Project has minimal plumbing only with no change of use. Water department has determined that the existing meter is adequate and there is no increase in ERCs; therefore, no wastewater review is required. If you have any questions, comments, or concerns, please contact Tyler Albright at Tyler.Albright@tampagov.net
Informational • 2024-08-27
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-08-27
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-06-24

Related Records

Track this permit to view related recordsStart Free Trial

Frequently Asked Questions

Related Links

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 6 Released - Building Permit - SECURED PLANS
TGH - SITE SIZE
Informational • 2017-01-18
Utilities - Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-08-27
Wastewater Commitment Required
Project has minimal plumbing only with no change of use. Water department has determined that the existing meter is adequate and there is no increase in ERCs; therefore, no wastewater review is required. If you have any questions, comments, or concerns, please contact Tyler Albright at Tyler.Albright@tampagov.net
Informational • 2024-08-27
Certificate of Occupancy Hold for Wastewater
If it is determined by the Wastewater department that a Wastewater Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Wastewater utility requirements have been satisfied. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2024-08-27
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-06-24

Related Records

Track this permit to view related recordsStart Free Trial
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →