**Plan Revision Description:** This revision updates the language on the plan to ensure the generator pad detail is included as part of the permit application. Previously, the detail for the generator pad was provided on the plans but was noted as "not part of the contract." This revision removes that note and clarifies that the generator pad is included in the scope of work for this permit. No other changes to the design or scope are being made.