The purpose of the project is to construct a new duplex pump station with 5 HP Flygt pumps and above grade valving. new manhole and approximately 27 ft of 8" PVC gravity sewer will be constructed on the influent side of the pump station. Approximately 50 ft of 8" PVC gravity sewer will be constructed to connect existing lines and manhole to the new manhole. Pump Station discharge piping will consist of 75 feet of 4" PVC FM that will be constructed from the PS to an existing manhole. New electrical panels will be installed. Site improvements include new concrete driveway, stairs to access the electrical panels and pump station, and new fencing. Approximately 60 ft of 8" water main (including a new fire hydrant assembly) will be relocated to accommodate the new manhole.
$1,028,284.00