• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0512549
JurisdictionTampa City
CategoryBuilding
Last CheckedOct 21, 2025
Status
Complete
Description

*PRIVATE PROVIDER – PLAN REVIEW AND INSPECTIONS* Detailed description of work." Fire restoration, remediation and rebuild from unit fire. Demo down to studs and build back to pre-existing conditions

Job Value

$19,000.00

Owner
Sp Johnson Kenneth Court Lp
Address
2510 N CENTRAL AVE 201, TAMPA, FL 33602
Zoning
RESIDENTIAL-35 (.60 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Sp Central Court 2012 Lp
Parcel
1911520000
Value
$3,190,800.00
Year Built
1971
Stories:
3
Units:
0
Buildings:
1
Land Use Code:
0398
Zoning Acres:
147427.2752
FIRM Panel:
1201140024C
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
004100
Population:
224

Preparing the map…

2510 N CENTRAL AVE 201, TAMPA, FL 33602

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 1 Complied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-11-15
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-12-31
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net regarding this hold. The scope of work involves minimal plumbing renovations, and water has determined that the existing meter is adequate for anticipated demand. Wastewater holds have been released
Informational • 2024-12-31
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-02-05
Utilities - Certificate of Occupancy Hold for Water
All cross-connection requirements met per FQ
Informational • 2025-02-05

Related Records5

BLD-25-0512549
Complete
BLDLP-25-002565
Complete
BLD-24-0505285
Withdrawn
BLDLP-25-002215
Complete
BLDLP-25-002981
Complete
BLDLP-25-002724
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLDLP-25-002565 (related)
  • BLD-24-0505285 (related)
  • BLDLP-25-002215 (related)
  • BLDLP-25-002981 (related)
  • BLDLP-25-002724 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 1 Complied, 5 Released - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-11-15
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-12-31
Wastewater Commitment Required
A Wastewater Commitment may be required for this building project. Upon review of the Utility application, If the Wastewater department determines that a Wastewater Commitment is required, the Building permit will not be issued until the Wastewater Commitment is issued and all related Utility fees are paid. Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net regarding this hold. The scope of work involves minimal plumbing renovations, and water has determined that the existing meter is adequate for anticipated demand. Wastewater holds have been released
Informational • 2024-12-31
Final Private Provider Report Required
Final Private Provider Report Required
Informational • 2025-02-05
Utilities - Certificate of Occupancy Hold for Water
All cross-connection requirements met per FQ
Informational • 2025-02-05

Related Records5

BLD-25-0512549
Complete
BLDLP-25-002565
Complete
BLD-24-0505285
Withdrawn
BLDLP-25-002215
Complete
BLDLP-25-002981
Complete
BLDLP-25-002724
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →