• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0512664
JurisdictionTampa City
Categorybuilding
Last CheckedOct 21, 2025
Status
Revision
Job Value

$1,750,000.00

Owner
Dfg-Tampa Cypress Llc
Address
6425 E COUNTY LINE RD, TAMPA, FL 33647
Zoning
SUBURBAN MIXED USE-3 (.25 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Dfg-Tampa Cypress Llc
Parcel
0329010902
Value
$22,449,900.00
Year Built
2009
Stories:
3
Units:
0
Buildings:
3
Land Use Code:
1610
Zoning Acres:
147427.2752
FIRM Panel:
1201120090E
Flood Source:
12057C_STUDY5
Floodway:
false
Census Tract:
011014
Population:
0

Preparing the map…

6425 E COUNTY LINE RD, TAMPA, FL 33647

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Utilities - Certificate of Occupancy Hold for Water
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net. If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-11-18
Private Provider Final Inspection Report Required
Private Provider Final Inspection Report Required
Informational • 2025-02-11
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-26
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-03-28
Building - 3 Applied, 5 Released - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-08-01

Related Records2

BLD-25-0512664
Revision
UTL-25-0000152
In Progress
BLD-25-0512618
Complete

Frequently Asked Questions

Related Links

Related Permits

  • UTL-25-0000152 (related)
  • BLD-25-0512618 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Utilities - Certificate of Occupancy Hold for Water
1. Backflow Prevention (Commercial with Private Fire Line Backflow Ownership or No Fire Line Service) - As provided on the application as a notice, in accordance with the Florida Administrative Code (F.A.C.) Chapter 62-555.360, you are required to install a backflow prevention assembly on all potable, irrigation, and fire lines prior to your activation of your water services. The owner will be responsible for owning, maintaining, and testing all backflow prevention assemblies. A reduced-pressure principle assembly (RP) shall be required on all domestic and irrigation service lines. A double detector check valve assembly (D.D.C.V.A.) must be installed on the dedicated fire line, unless otherwise required in the City's Cross Connection Control and Prevention Manual. You will be required to have the assembly(ies) tested at the time of installation & annually thereafter. You must provide the test results to the Water Department within seven (7) calendar days of test completion. You must install the backflow prevention assembly prior to the inspection to be conducted by the Field Quality Section. Neglecting to install this assembly is a violation of the Florida Administrative Code and enforcement action will occur per F.A.C. 62-550, and your water service will be disconnected when this requirement is not met. A hold has been placed on the Certificate of Occupancy / Certificate of Completion for the final inspection and approval of the installed back flow prevention device(s). To schedule an inspection of the backflow prevention devices, please contact Field Quality at (813) 231-5266 or FieldQuality@TampaGov.Net. If it is determined by the Water department that a Water Commitment is required for this building project, the Certificate of Occupancy will not be issued until all Water utility requirements have been satisfied. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2024-11-18
Private Provider Final Inspection Report Required
Private Provider Final Inspection Report Required
Informational • 2025-02-11
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-26
Utility Application Submittal
A Utility application must be submitted before the Building Permit can be issued. Please contact Water directly at (813) 274-7405 or WaterCommitment@tampagov.net
Informational • 2025-03-28
Building - 3 Applied, 5 Released - Building Permit - Revision Record Associated to this Project
There is a revision record associated to this record
Informational • 2025-08-01

Related Records2

BLD-25-0512664
Revision
UTL-25-0000152
In Progress
BLD-25-0512618
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →