• Documentation
  • Permits
  • Blog
Start for freeSign in

Footer

Insights that empower smarter building decisions

Product

  • Watchlist
  • Portfolio
  • Market Radar
  • Contacts
  • Notifications

Resources

  • Permits
  • Contact
  • Enable SMS Alerts
  • Feature Requests
  • Docs

About

  • Story
  • Blog

Legal

  • Terms of Use
  • Privacy Policy
  • Cookie Policy
  • SMS Consent

Subscribe to our newsletter

© 2026 Plotwise is a registered business name operated by Flowmize LLC. All rights reserved.

X (formerly Twitter)LinkedInFacebookInstagram
Permit Number
Jurisdiction
Category
Last Checked
Status
Description
Job Value
Owner
Address
Zoning
Risk

Permit Details

Source
Permit NumberBLD-25-0512799
JurisdictionTampa City
Categorybuilding
Last CheckedOct 21, 2025
Status
Expired
Job Value

$40,000.00

Owner
Roza Property Management Llc
Address
212 S FREMONT AVE, TAMPA, FL 33606
Zoning
RESIDENTIAL-20 (.50 FAR)
Risk
X
Flood Zone Description
AREA OF MINIMAL FLOOD HAZARD
Advanced details
Owner
Roma 71 Llc
Parcel
1842850000
Value
$448,268.00
Year Built
1924
Stories:
1
Units:
1
Buildings:
1
Land Use Code:
0100
Zoning Acres:
147427.2752
FIRM Panel:
1201140023C
Flood Source:
12057C_STUDY4
Floodway:
false
Census Tract:
004900
Population:
11

Preparing the map…

212 S FREMONT AVE, TAMPA, FL 33606

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 1 Not Applicable - Building Permit - Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-11-21
Default - 1 Applied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2024-11-21
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-26

Related Records2

BLD-25-0512799
Expired
BLD-25-0512799-REV1
Withdrawn
BLDLP-25-004005
Complete

Frequently Asked Questions

Related Links

Related Permits

  • BLD-25-0512799-REV1 (related)
  • BLDLP-25-004005 (related)

Jurisdiction

  • View all Tampa City permits
  • Official Portal

Learn More

  • How permit tracking works
  • Understanding permit statuses
  • Setting up notifications

Processing Status

Track this permit to view processing detailsStart Free Trial

Fees

Track this permit to view fee breakdownStart Free Trial

Inspections

Track this permit to view inspection historyStart Free Trial

Conditions

Building - 1 Applied, 1 Not Applicable - Building Permit - Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-11-21
Default - 1 Applied - NOC Required - Notice of Commencement Required
Notice of Commencement is required to be uploaded to the permit record prior to the requesting 1st inspection
Informational • 2024-11-21
Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2025-02-26

Related Records2

BLD-25-0512799
Expired
BLD-25-0512799-REV1
Withdrawn
BLDLP-25-004005
Complete
Unlock detailed permit data and get notified when this permit changes.
Get SMS & Email AlertsStart Free Trial
Plotwise Change Tracker
Create a free account to track this permit and get notified when it changes.
Start Free Trial →
Get notified when this permit changes.
Add to Plotwise Watchlist →