Building - 6 Applied - Building Permit - Please see Impact Fee Calculation Sheet
Please see Impact Fee Calculation Sheet
Informational • 2024-12-12
Approved Blower Door Test Form Required
Residential buildings and dwelling units that have a permit application date of July 1, 2017 or later will require a Blower Test performed by an approved third-party. Blower Door Testing reports verifying seven (7) air changes per hour or less must be uploaded to the Accela project record. The Certificate of Occupancy will not be issued until the approved test is accepted by the City. Buildings with less than 3 air changes per hour will require a whole house ventilation system in accordance with M1507.3. Please visit our website to access the form (https://www.tampagov.net/sites/default/files/public%3A/additionalfiles/blower_door_test_form_final.pdf)
Informational • 2024-12-12
Termite Cert
Termite Certification Required
Informational • 2025-01-27
required mitigation
Install ten 2.5" Caliper Type 1 Trees, two 2.5" Caliper Type 2 Trees and one 6' Clear Trunk Palm or pay into the applicable Tree Trust Fund for any trees not planted
Informational • 2025-03-24
Utilities - Certificate of Occupancy Hold for Wastewater- Recorded Joint Use and Private Easement
Certificate of Occupancy Hold for Wastewater- Customer to provide a copy of Recorded Joint Use and Private Easement document. (UTL-25-0000316) Please contact Wastewater directly at (813) 274-8065 or WastewaterCommitment@tampagov.net
Informational • 2025-04-10